Solar panels and planning permission in Surrey and Berkshire
Most homes in England can have solar panels on a pitched roof without applying for planning permission, because the work counts as permitted development. In Surrey and Berkshire the exceptions to watch are listed buildings, conservation areas, Article 4 directions and, for some homes, the Surrey Hills or North Wessex Downs National Landscapes. The Green Belt, which covers much of the area, doesn’t change the rules for panels on a roof. Only your council can confirm what applies to your address.
Last reviewed 22 October 2026. The national rules changed on 27 August 2026. Sources are listed at the end of this page.
The national rules for panels on a house
The rules were updated on 27 August 2026. Until 27 August 2027 you can follow either the old rules or the new ones (Planning Portal). On a house, the main limits are:
Where the panels go
The limit
Pitched roof
Not above the highest part of the roof (excluding the chimney), and no more than 200mm out from the roof slope.
Flat roof
No more than 600mm above the highest part of the roof. In a conservation area or a National Landscape, you need prior approval from the council first.
Wall, balcony or roof enclosure facing a road
No more than 200mm out from the wall. Not allowed at all in a conservation area.
Other walls, balconies or roof enclosures
No more than 400mm out from the wall.
Any building
Sited, as far as practicable, to limit the effect on the building’s appearance and the area, and removed once no longer needed.
If your panels fall outside these limits, you will usually need to apply for planning permission. Leaseholders may also need permission from their landlord, freeholder or management company.
Conservation areas
Conservation areas are common here. The councils covering our six towns list more than 160 between them, including the centres of Esher, Guildford, Dorking, Windsor, Wokingham and Newbury. The national rules treat them differently in three ways:
• Panels must not be fitted to a wall, balcony or roof enclosure that fronts a road.
• Panels on a flat roof need prior approval from the council before they go up.
• Panels in the garden that sit closer to the road than the house need prior approval, and must be no higher than 2 metres.
The rules do not single out a roof slope that faces the road. In principle, a front roof slope in a conservation area can still be permitted development, but the council can remove these rights locally (see Article 4 directions below). Many councils recommend asking for advice before altering a home in a conservation area.
Listed buildings
Permitted development does not apply to a listed building. You need listed building consent for panels on the building itself, and doing the work without consent is a criminal offence. Panels are also not permitted development on another building within the grounds of a listed building, or on the ground within those grounds.
That doesn’t mean panels are ruled out. Historic England’s 2024 advice is that panels on a less prominent roof slope will generally be acceptable, even if visible, and that an outbuilding or land within the grounds is generally preferable to the main building. Grade I and II* buildings may be exceptions. A 2025 application in Guildford followed exactly that route, seeking planning permission and listed building consent together for panels on the roof of a detached garage rather than the house.
The Surrey Hills and North Wessex Downs
Two National Landscapes, formerly Areas of Outstanding Natural Beauty, touch our area. The Surrey Hills runs along the North Downs from Farnham to Oxted and south into the Greensand Hills; it surrounds much of Dorking and reaches the southern edge of Guildford. The North Wessex Downs covers much of West Berkshire, including the countryside around Newbury. On a house, the national rules treat a National Landscape more lightly than many people expect: panels on a pitched roof follow the standard limits, while panels on a flat roof, and some ground-mounted panels near a boundary, need prior approval first.
The Surrey Hills may also grow. In August 2026 Natural England sealed an order to extend it by 129 square kilometres, more than 30%, including land on the Hog’s Back and around Hatchlands and East Clandon near Guildford. The proposal went to the Secretary of State in September 2026, and there is no set date for a decision. If it is confirmed, homes in the new areas will come under the National Landscape rules.
Article 4 directions
A council can remove permitted development rights in a specific area through an Article 4 direction. Where one applies, you may need planning permission for work that would otherwise be allowed. Mole Valley District Council says parts of the Dorking Conservation Area have extra controls under an Article 4 direction, and some of Guildford Borough Council’s conservation area appraisals discuss Article 4 controls that mention roof lights and solar panels. These directions are local, so the only way to know is to check with your council.
Gardens, the Green Belt, trees and plug-in solar
Stand-alone panels in the grounds of a house can also be permitted development. The main limits are an array of no more than 9 square metres, and a height of between 1 and 4 metres depending on how close the panels are to the boundary and the road. Panels within 5 metres of the boundary in a conservation area or a National Landscape need prior approval. Panels are not permitted development within the grounds of a listed building.
Much of Surrey and of Windsor and Maidenhead is Metropolitan Green Belt. The Green Belt isn’t one of the designations that changes the permitted development rules for solar, so rooftop panels on a house follow the same national limits there. It matters more when your plans need planning permission, such as a large ground-mounted array or a new outbuilding to carry panels, because councils apply strict Green Belt policy to new structures.
Cutting back a tree to reduce shading has its own rules. Trees protected by a Tree Preservation Order need the council’s consent before any work, and in a conservation area you must give the council six weeks’ notice before cutting most trees. Ask your installer to assess shading before you plan any tree work.
The 2026 changes also cover small plug-in panels that connect to your home through a standard socket. These must not be fixed to a wooden wall, fence, gate or timber-clad surface, because of the fire risk.
How to check your address
1. Is your home listed?
2. Is it in a conservation area?
Check your council’s conservation area maps (links below).
3. Is it in a National Landscape?
4. Is there an Article 4 direction?
Ask your council’s planning team.
A good installer will also check these points before quoting. If your home is listed or in a conservation area, tell them at the start.
Your council
Town
Council (from 1 April 2027)
Conservation areas
This is general information, not planning advice. Confirm the rules for your address with your council before you go ahead.
FIND OUT MORE ABOUT SOLAR IN YOUR AREA
GOOD QUESTIONS. CLEAR ANSWERS.
Frequently asked questions
A few things worth knowing before you start.
GET STARTED
Not sure what applies to your home?
Tell us about your home and we’ll introduce you to MCS-certified installers serving your area, who will check the planning position before quoting. There is no cost to you and no obligation.
SOURCES
Where this guide’s information comes from
Last reviewed 22 October 2026. Rules change, so check the sources below before you act.